Air Filter Sealing Strip Continuously Sticking Machine

Specification
|
Filter size |
|
|
Length |
150~500mm |
|
Width |
140~350mm |
|
Height |
10~50mm |
|
Efficiency |
6s/piece |
|
Voltage |
220V |
|
Power |
14KW |
|
Air pressure |
0.6Mpa |
|
Weight |
220KG |
|
Overall dimension |
7500*2500*2000mm (L*W*H) |
|
Number of circulating molds |
≥18 |
|
Equipment exchange time |
20 minutes |
Equipment Parameter Introduction
1. The equipment is suitable for product range: length: 150~400mm; width: 150~350mm
2. Glue scraping height: 10~50mm
3. Voltage: 220V; Air pressure: 0.6Mpa; Power: 15KW; Weight: 500KG
4. Action time of a single mechanism of the equipment: ≤7S
5. Equipment size: length x width x height: 11200x2600x2000mm
6. Equipment operators: mold unloading (manual filter element placement) ≥ 1 person
7. Number of circulating molds: ≥18
8. It takes 0.5 hours to change the equipment.
9. Equipped with 20L double pump glue machine, two 3m rubber hoses and two 0-60mm adjustable scraper guns.
10. Make sure the filter element is flat and in place, first clamp it on both sides and then press it down.
Device Reference View Introduction
Device Main View

Equipment Top View

Equipment Structure Introduction
Introduction of Each Institution

Action Flow Introduction:
1. The operator loads the products onto the molding die one by one;
2. Place the filter element on the conveyor line. The product automatically corrects the flow edge;
3. The product is automatically cut after the edge is attached;
4. The separated products automatically enter the demoulding mechanism;
5. The mold returns to the working platform through the elevator reflux conveyor line;
6. Automatic fine shearing after product demoulding;
7. Conveyor lines to be collected.
Equipment Station Introduction
Station 1: Front Lifting Mechanism of Fixture

Station 2: Filter Element Installation Work Platform (one)

Station 2: Filter Element Installation Work Platform: Platform Size (two)

Station 3: Fixture Filter Element Calibration Mechanism

Station 4: Edge Bonding Mechanism

Station 5: Edge Bonding Mechanism-glue Machine-roll Material Placement

Station 6: Jig Separation Roller Line

Station 7: Post-fixture Reflow Mechanism

Station 8: Product Fine Shearing Mechanism (I)

Workstation Introduction 8: Product Fine Shearing Mechanism - Material Taking Mechanism (II)

Workstation Introduction 8: Workstation Seven: Product Fine Shearing Mechanism - Servo Electric Adjustment Spacing (Ⅲ)

Station 9: Discharging Conveyor Line

Equipment Size Introduction

The equipment consists of eight parts, which can be disassembled, and the length of each part does not exceed 2.5 meters.
Fixture Requirements

Hot Tags: air filter sealing strip continuously sticking machine, China air filter sealing strip continuously sticking machine manufacturers, suppliers, factory, Automotive Air Condition Filter Continuous Pasting Machine, Automobile Air Conditioning Filter Four Side Production Line, Automatic Cabin Air Filter Edge Banding Machine, Automobile Filter Long Edge Fine Cutting Production Line, automobile filter production machine, air filter make machine







